ryan1stinger
Sustaining Member
- Joined
- Sep 24, 2018
- Messages
- 376
- Reaction score
- 99
- Points
- 28
I'm in talks with a tuner regarding installing the Snow Stage 2 and to provide a quote they are looking for an ETA on how long to install. I'm purchasing the 2.5g reservoir and will want to run the stainless steel braided lines under the car near the fuel line, for greater safety and the lines will be connected to the UP fmic cold pipe which already has the bungs. I've seen posts here where the install took many many hours, but I'm looking for an ETA from a professional install. I would think this could be done in three hours, but for anyone who has a professional install it, please share the time. If anyone has a recommendation for an installer in the Bay Area, that would be great. Searching the internet and I haven't be able to find an install video for the Kia Stinger that provides time to install. Instructions and/or video would be appreciated as well.
Thank you!
Thank you!